
Как правильно укладывать инженерную доску: стяжка, фанера, клей или замок, ёлочка и цены
Укладка инженерной доски: стяжка 2 мм/2 м, 20 МПа и 2 % влажности, когда нужна фанера, клей или замок, акклиматизация, запас и цены. Разбор Дениса Фурсова.
Subfloor inspection before you buy · installation with a warranty
Turnkey parquet installation at Parketiko means a floor ready for use, not just boards. Before you buy, our specialist inspects the subfloor and issues an assessment of the installation method. We calculate the quantity with a cutting allowance, deliver the material and install the parquet ourselves — with a warranty. If you have your own installer, we provide them with technical support. We work in Almaty and Astana.
Before the parquet is bought, a specialist looks at the screed on site: the installation method and subfloor preparation go into the estimate from the start.
We select engineered parquet board for your project and calculate the quantity with a cutting allowance — for the format and the floor plan.
Work on the screed is planned according to the assessment. Levelling and repair of the screed are finished before the boards are brought to the site.
We bring the material to the site — terms for Almaty and Astana below. Before installation the boards rest in the room and take on its temperature and humidity.
We do the installation ourselves. The installation method follows the subfloor assessment, the format follows your project.
We give your crew technical support so that the subfloor and the installation are done correctly.
Standard for every project we take on
Before the sale, a Parketiko specialist inspects the screed on site and issues a written assessment. Not a promotion — a standard: this is how we handle every project.
The right laying technology for your specific screed, not "the usual".
Repair and levelling of the subfloor costed together with installation — no surprises in the estimate.
Subfloor problems become visible before laying, not after.
The floor won't shift or bulge: fewer reworks, fewer complaints.
Installation starts with the subfloor. We check the screed on three parameters: flatness, strength and moisture. A flat subfloor is not necessarily a strong one, and moisture is measured with a meter, not by eye. All our products are engineered parquet board, and it has three installation methods: glued directly to the screed if the screed is flat, strong and dry; glued onto plywood if the screed is weak; floating — on an underlay. Herringbone parquet from the catalog is glued down — onto the screed or onto plywood. Which method of laying parquet board suits your floor, we state in the assessment after the inspection.
Deck-pattern parquet installation: boards run in rows with an offset. Guideline cutting allowance — 5%; for diagonal installation — 7–8%.
Herringbone parquet installation with rectangular blocks meeting at 90°. Helps with uneven walls: the pattern sits along the wall without a wedge. Guideline allowance — 10–12%.
French herringbone installation: blocks with angled ends meet in a single line. Harder to install than English herringbone. Guideline allowance — 10–12%.
At Parketiko we believe it is entirely rational and right to concentrate full responsibility for the final result in the hands of one supplier.
When the parquet, subfloor preparation and installation are done by different contractors, it is hard to tell who is responsible if something goes wrong with the floor. That is why we offer the full package: the boards, the subfloor check and the installation.
If your own installer does the work, we inspect the subfloor before you buy and give the crew technical support during installation.
In Almaty we deliver the parquet and carry it up to your flat free of charge — in exchange for a review with photos on 2GIS. In Astana we ship in-stock items within a few days and deliver across the city and the whole country. Addresses — showroom in Almaty and showroom and warehouse in Astana.
We take back leftover in-stock items after installation in intact factory packaging. Not enough — we'll top up from the warehouse if the item is in stock.
With a prepayment of 70% or more the material price in tenge stays fixed for 60 days.
More on screeds, installation methods, herringbone and climate — in articles by Denis Fursov.

Укладка инженерной доски: стяжка 2 мм/2 м, 20 МПа и 2 % влажности, когда нужна фанера, клей или замок, акклиматизация, запас и цены. Разбор Дениса Фурсова.

Подложка под паркетную доску: нужна ли, какая лучше и какой толщины, клей или замок, стяжка или фанера, неровное основание, цены. Разбор Дениса Фурсова.

Паркет ёлочкой: чем английская ёлочка отличается от французской (шеврон), размер планки, пять раскладок без доплаты, укладка и цены в Казахстане.

Какая влажность нужна паркету в Астане и Алматы, почему зимой появляются щели и что с ними делать: нормы ESTA и ГОСТ, увлажнитель, чек-лист по сезонам.